首页 体育内容详情
皇冠最新网址:Fukushima debris removal delayed by another year

皇冠最新网址:Fukushima debris removal delayed by another year

分类:体育

网址:

SEO查询: 爱站网 站长工具

点击直达

皇冠体育官网www.hg108.vip)是一个开放皇冠正网即时比分、皇冠官方的平台。皇冠体育官网(www.hg108.vip)提供最新皇冠登录,皇冠体育官网包含新皇冠体育代理、会员APP,提供皇冠官网代理开户、皇冠官网会员开户业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

皇冠最新网址www.hg9988.vip)是一个开放皇冠网址即时比分、皇冠网址代理最新登录线路、皇冠网址会员最新登录线路、皇冠网址代理APP下载、皇冠网址会员APP下载、皇冠网址线路APP下载、皇冠网址电脑版下载、皇冠网址手机版下载的皇冠最新网址平台。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。
 当前暂无评论,快来抢沙发吧~

发布评论